Cost savings $200.00/day

Cost savings $1000.00/day

Cost savings $250.00/day
Western Utilities Cost Savings Analysis

Job: Lincolnwood

Dumping fees $100.00/load x 2 loads/day

Travel time 2hours/load x 2 loads/day @ $250.00/hr               

Backfill material 1 load/day @ 250.00/load           
     
_________________________


Total cost savings = $1450.00/day

Call Toll Free (888) 550-1027